In the event of explosive dust, if it becomes necessary to protect a filter with the vent membranes, a certified partitioning valve must be installed. This valve prevents the explosion to reach the department through the extraction duct. In these cases, we choose the certified component with the correct features from amongst our suppliers. The...
CONTACT PHONE
OPEN HOURS
MON - FRI
8:30 - 12:30 / 13:30 - 18:30
ADDRESS
VIA DELLA VALLE 39,
CARATE BRIANZA - MB
ITALY
Project Category: <span>IMPIANTI</span>
BREAKING MEMBRANE
In the case of explosive dust, if it becomes necessary to protect a filter by means of explosion venting, we install breaking membranes certified by different vendors.
DOUBLE GLOVE BOX
Glove box with dual access – fan for maintaining full depression of absolute filter in stainless steel AISI316
WHEELED CONTAINER
Design and creation of a container according to customer specifications
METAL STRUCTURES
Design and installation of metal structures for machinery installation.
AIR INTAKES
Modification of a structure and glass surface for installing adjustable dampers for room ventilation.
PRODUCTION LINE DESIGN AND INSTALLATION
The project involved the design for the positioning of a paint production line with machinery supplied by the customer. The connecting pipes, hoppers, structures and chiller are supplied by Astra. Some photos contain fittings of other machinery.
HOISTS
Turnkey hoist installation within more complex projects.
EXTRUDER SCREW EXTRACTION GEARS
design and installation of a winch anchoring structure to facilitate the extraction of the screws of an extruder
APHONIC BOOTHS FOR FANS
Structural aphonic booths for soundproofing the fans of our systems or those already in place at the customer’s premises.